Gas generators power plants from 50 kW

for independent power supply and electricity cost savings

Delivery, commissioning,
spare parts and maintenance

Models in stock
and to order from 50 kW

Select a power plant

Manager online

WhatsApp Quick equipment selection

Telegram
Greenline channel

Manager online

20%
VAT
refund

Do not pay all at once!
Prepayment
only 50%

Official import
to Kazakhstan. Certificates,
customs clearance

Production video review
Cost 1 kW
from 13 ₸

For industrial enterprises and plants

For farms
and greenhouses

For shopping centers
and stores

For data centers and mining farms

4 situations when you definitely need a gas generators power plant

Select a power plant

Your current electricity tariff is above 4 tenge per 1 kW

Savings from implementing a GPU can be up to twofold. The cost of 1 kWh starts from 2 tenge

You use expensive equipment that is sensitive to voltage

The power plant stabilizes voltage and current. This is especially important for conveyors, pumps, machine tools, medical equipment, computer electronics, servers and graphics cards

You have high heating and water-heating costs

The power plant generates
roughly the same amount of heat as
electricity. This heat can be
used for heating, hot water supply and more

There is no access to power grids

A gas generator unit can fully cover electricity demand even in harsh climates. The unit capacity is calculated according to your company’s needs

Select a power plant

Equipment catalog in stock

We invite you to view power plants in our warehouse or order delivery of a specific product

Delivery to
any city in Kazakhstan and the CIS

Documents, certificates and customs clearance

Equipment leasing available

Commissioning and handover
into operation

SKU: 1234589

In stock
Cummins 200 kW

Cummins 200 kW Gas-Piston Power Station

Add to cart

SKU: 12342329

In stock
MWM 1000 kW

Gas piston power plant MWM TCG 3016 V16S 1000 kW

Add to cart

SKU: 12341189

In stock
Caterpillar 689 kW

Caterpillar G3512 689 kW Gas Piston Power Plant

Add to cart

Major savings after commissioning a gas generators power plant up to 230,000,000 tenge per year*

Production video review
Grid power supplier
Gas generators power plant

Amount of electricity consumed per day: 21,600 kWh

Days

365

Electricity tariff, ₸

46,3 ₸.

Total cost:

364 792 680 ₸.

Days

365

Price of 1 m³ of gas,

43,6 ₸.

Maintenance

26 056 620 ₸.

Total cost:

129 725 487 ₸.

Savings: 235,067,193 ₸ / year

Payback period: 1 year. Savings on heating and hot water supply are not included.

*The calculation assumes maximum equipment output for 365 days without downtime or outages

Get a payback calculation
for your enterprise

Completed projects in equipment supply

FG Wilson SG240

Supply of two new 198 kW gas generators power plants
for Agrocomplex Yuzhny JSC, Abaza municipal district

Task: The client requested cost optimization and reduction of fruit and vegetable production costs.

Solution: After analyzing current business processes and cost items, we proposed a set of two new Wilson SG240 gas generators units. The enterprise saved 20 million rubles per year on electricity and heating.

Caterpillar G3616

Search and supply of a 3,859 kW Caterpillar G3616 gas generators engine for the client.

Task: The customer needed to repair an existing gas generators unit.

Solution: Inspection revealed crankshaft destruction and related damage. Repair with new spare parts was estimated at 200 million rubles. Our specialists worked out an alternative option: supply of an identical donor unit. As a result, the repair including donor supply cost 20 million rubles.

Cummins QSV91, Cummins QSV81

Supply of a used 1,500 kW Cummins QSV91 gas generators generator for Kingisepp Machine-Building Plant.

Task: Find five generators of a specific model in working condition and fit within a limited budget.

Solution: Within six months, our company supplied the requested machines that met the client’s requirements. Deliveries were made from several European countries.

FG Wilson PG345

Supply of a new 275 kW gas generators unit for a production site in Nizhny Tagil, Abdulin A.N.

Task: Heating and power supply for a production site under limited electrical capacity and difficult capacity expansion.

Solution: We helped the client select a gas generators unit covering power demand while reducing power supply costs by half.

FG Wilson P135

Supply of two new 198 kW diesel generators for a power center.

Task: Emergency power supply.

Solution: To solve the task, we offered power plants from stock with a promotional discount.

Cummins QSV91

Supply of a 2,000 kW Cummins QSV91 gas generators generator for Khosta LLC, Sochi

Task: The client needed a gas generators unit with a reliable engine from a proven manufacturer, with long service life, low maintenance needs and easy servicing.

Solution: A Cummins QSV91 was supplied and commissioned.

FG Wilson PG750

Supply and container packaging of a new 600 kW FG Wilson PG750 gas generators generator for RPK PARUS LLC, Berezovsky

Task: Supply of a gas generators unit with the required capacity from a European manufacturer.

Solution: During project development, it became clear that the unit would be installed outdoors and that the enterprise could reduce heating costs by recovering heat from the power plant. We proposed and implemented a containerized version with a heat recovery system, commissioning, service maintenance and spare parts supply.

Olympian G80 - 50 kW

Supply of a new 50 kW Olympian G80 gas generators generator for a concrete plant in Makhachkala.

Task: Cost reduction and increase of the enterprise’s electrical capacity.

Solution: Supply, installation and commissioning of a gas generators unit with a heat recovery system.

Wilson PG620 - 500 kW

Supply of a new 500 kW gas generators power plant for an ice arena in Perm.

Task: Reduction of power supply costs for refrigeration units

Solution: Selection, supply, installation and commissioning of a 500 kW gas generators power plant.

FG Wilson PG345 - 275 kW

Supply of a new 275 kW gas generators generator for a data center in Dolmatovo, Sverdlovsk Region.

Task: Provide reliable, high-quality and economical power supply for a mining farm.

Solution: FG Wilson PG345 selection, supply, installation and commissioning of a gas generators power plant.

FG Wilson PG750 analog - 600 kW capacity.

For an agricultural site in Nizhny Novgorod.

Task: Increase the enterprise’s electrical capacity with minimal costs and reduce recurring electricity and heating expenses.

Solution: Design, manufacture, supply, installation and commissioning of a 600 kW block-modular gas generators power plant complete with a heat recovery system

Power plant installation options

Open-frame version

The unit is installed on an open
site without an additional protective enclosure.

More details
Enclosure

The unit is installed in a special enclosure for protection from weather conditions and external impact.

More details
Sever block container

The unit is installed in a container with heating and ventilation systems for operation in northern conditions.

More details
Select a power plant installation option

Frequently asked questions

The power plant has been delivered. What should I do next?

Greenline provides turnkey commissioning: installation, connection and setup of the gas generators power plant within the power supply system.

Will it be difficult to find spare parts and repair specialists?

Cummins engines have been supplied to the region for decades and are used in vehicles and special equipment by many manufacturers. You can easily find spare parts and service personnel for a gas generators unit with a Cummins engine.

You can purchase service and maintenance from our company or find a technician yourself.

If I buy an unreliable unit, when might it fail?

Cummins engine modifications have been widely used in construction, power generation and mining for decades. You receive proven quality and reliability from a time-tested engine.

What are the payment terms for the equipment?

We accept payment to the company bank account or through another convenient method. Leasing financing is also possible.

What are the gas technical requirements? GOST 27577-2000

Gas calorific value.....8400 cal/kg
Gas composition.....CH4≥92%
Gas temperature.....10~30℃
Gas humidity.....<60%
Pressure at gas cylinder outlet.....1.5 bar
Gas inlet pressure.....10 kPa
Exhaust gas back pressure.....<5 kPa

How can power plant heat be used efficiently
for enterprise needs?

We offer installation of gas generators power plants with a cogeneration function, allowing simultaneous production of electricity and heat.

This is useful for enterprises that need both electricity and heat for production or heating. Such a configuration can be valuable for manufacturing plants, greenhouses, hotels, hospitals and other facilities with high simultaneous demand for power and heat.

In what version can a gas generators unit be installed? What
options are available for harsh climates?

A gas generators unit can be installed as an open-frame unit, in an enclosure, or in a Sever block container for harsh climate conditions.

What are the maintenance intervals and cost?

The approximate maintenance cost is calculated per kWh. The exact schedule depends on the model and operating mode.

How much gas does the power plant consume on average?

Load 100%.....0.285 m³/kWh
Load 75%.....0.304 m³/kWh
Load 50%.....0.325 m³/kWh
Load 25%.....0.396 m³/kWh

Which equipment is suitable for my business?

Contact our specialists: they will help select the equipment best suited to your tasks.

Where can I find your bank details?

Bank details:
Bank: Sberbank PJSC
Current account: 40702810016750000435
Tax ID: 6671327661
KPP: 667101001
BIC: 046577674
Correspondent account: 30101810500000000674

Where can I view the equipment?

We are located at: Astana, Saryarka district, Bogenbai Batyr Ave., 3/3, office No. 9

Which services are included in the equipment sale price?

The equipment sale price includes only the equipment itself. Additional services can be provided for an extra fee.

How quickly can you deliver?

Delivery time depends on the delivery address and equipment availability. Please ask the manager for exact delivery terms.

Under what conditions can I get a discount?

We can offer a discount for large-volume equipment purchases. Contact our specialists for details.

Do you connect the power plant to the gas network?

We do not perform the gas connection process. A gas service specialist and a power engineer must be present during connection.

Did not find an answer?

Get a quick
consultation via WhatsApp

get a consultation

Manager online